+86-21-65673981
       
gaochang@gaochangmed.com

GAOCHANG MEDICAL

So and so Healthcare

MEDICAL

HEALTH
    
EXCELLENT SERVICE
REASONABLE PRICE
HIGH QUALITY
more+
     
产品展示
Latest
    product
为了能实现“提供百分之百满意的客户服务”的诺言,我们
配备了专业的管理人员,在全国更有队伍庞大的技术人员和维修人员。
公司新闻
NEWS CENTER
    
▶ 当前位置:
catheter/tube tip forming machine

catheter/tube tip forming machine

 tip forming equipment  is used for catheter tip forming with ultra high frequency, fast speed and easy to operateApplication: This machine or equipment is suitable for PVC (polyvinyl chloride), TPU (polyurethane) and almost all thermoplastic pipes. These catheters have a wide range, including cardiovascular catheters, suction tubes, stomach tubes, urinary catheters, nasal feeding tubes, thoracic drainage tubes, tracheal intubation and so on.

 

Applicable pipes: diameter range 0.7-16.7mm. That is, fr2-fr50 range. It has a wide range of applications.

 

working efficiency: Generally, the total manufacturing time of melting head is 4-5 seconds, in which the heating time (i.e. the melting time of the tube) is less than one second and the cooling time is 3-4 seconds. The cooling time of the tube required for the coarser and precise forming can be extended a little.

 

Operation control; There are two modes for the operation : single hole and circulation

 

OEM is workable


0.00
0.00
  

 tip forming equipment  is used for catheter tip forming with ultra high frequency, fast speed and easy to operateApplication: This machine or equipment is suitable for PVC (polyvinyl chloride), TPU (polyurethane) and almost all thermoplastic pipes. These catheters have a wide range, including cardiovascular catheters, suction tubes, stomach tubes, urinary catheters, nasal feeding tubes, thoracic drainage tubes, tracheal intubation and so on.

 

Applicable pipes: diameter range 0.7-16.7mm. That is, fr2-fr50 range. It has a wide range of applications.

 

working efficiency: Generally, the total manufacturing time of melting head is 4-5 seconds, in which the heating time (i.e. the melting time of the tube) is less than one second and the cooling time is 3-4 seconds. The cooling time of the tube required for the coarser and precise forming can be extended a little.

 

Operation control; There are two modes for the operation : single hole and circulation

 

OEM is workable